Construction Project Checklist
A plain-language checklist of the major decisions that should not be left until the site is already busy.
Use this before the next decision
- Confirm the latest approved drawings and specifications
- Confirm responsibilities between client, consultants and contractor
- Establish a realistic procurement and programme strategy
- Confirm the cost plan and allowances
- Confirm material/product approval procedures
- Establish site reporting and decision routes
- Record variations and changes formally
- Track quality issues rather than relying on memory
- Plan inspections, testing and commissioning
- Prepare for handover, defects, documentation and operation
HSD note: This checklist helps organise questions. It does not confirm site conditions, approvals, costs, structural adequacy or legal title. Those matters require appropriate professional investigation.
Next step
Want the questions applied to your situation?
The HSD Intelligence Lab can turn an early situation into a preliminary project map, while a professional engagement can test the facts that matter.