Case Study / Hospitality

Lobster Pot Hotel

LocationVictoria Island, Lagos
StatusCompleted · 2008
HSD scopeDesign + construction
Lobster Pot Hotel
01 / Project narrative

The brief

Pent-floor/addition work for a hospitality property in Victoria Island, delivered in a coastal environment with demanding fabrication and construction conditions.

The challenge

The work involved a steel barrel-truss roof, curved POP ceiling, specialist fabrication and construction at height, with coastal salt-air exposure adding a durability consideration.

The response

The delivery coordinated steelwork, specialist ceiling geometry and site execution around the constraints of an occupied urban hospitality context.

The result

A completed 2008 addition recorded in the HSD archive. A preferred contemporary/selected photograph is still pending.

02 / HSD thinking

The thinking behind the project

The project demonstrates the importance of specialist fabrication and construction control where geometry, structure and site access are tightly interdependent.

Project record
LocationVictoria Island, Lagos
Completion2008
HSD roleDesign + Construction
TypeHospitality / hotel addition
Key considerationsSteel barrel truss, curved ceiling, work at height, coastal exposure
Explore the project
Share / Continue the conversation
Have a project in mind?

Let's discuss what the building needs to do.

Start a project →